2010年10月22日星期五

continue on dome strut ; first scaffold & gangplank construction (22.10.2010)

Friday (22.10.2010)at 3 pm
place : dome site





(act) queue up for screw bamboo strut


before screw , i make sure length of my strut is right ...



he is helping us screw our strut ...



haiz....all the bamboo we tie on yesterday is slack already ... so we need to separate (act) all of it and tie it again ...


Muji is taught me how to tighten the bamboo ...



im tried to pull up the tie (act) and make sure it is tight (tight) ...


(product) this is our section 2 scaffold



section 2 members are doing gangplank ...


me and my friend are helping tied bamboo too ...

to make the gangplank look like tidy (rule) so we need to cut out the rest of bamboo ...

section 2 gangplank is strong enough because 4 of us can stand up and walk on the gangplank ...




(product) section 2 gangplank ...

2010年10月21日星期四

tensegrity

This is the new assignment that given by En.Rusli on Monday (18.10.2010).
On this assignment , i choosen to do 5 strut of tensegrity ...




the ingredient of making the tensegrity ...

stater i bring my bamboo to workshop because i needed workshop assistant on helping me punch hole on the bamboo ....

build up the tensegrity by using rope penetrate pass through the hole ...


this is my tensegrity ...

intention : make a tensegrity
act : searching information from the internet , going to workshop , repeat stitch bamboo ...
actor : me and workshop assistant
rule : submit on 25th October 2010 , tensegrity is same size with your dymaxion ...
place : exhibit on SOUL SHIFT
product : 5 strut tensegrity



first scaffold construction (21.10.2010)

Thursday (21.10.2010) at about 3.30 pm , me and my friend going to 'dome site ' for tighten our strut . After tighten it , we going to help the others strut that needed to tighten ...
(actor)every hbp student RUS101 including studiomaster
En.WANB , En. NAJIB is in busy status ...
BUSY IN (act) tighten struct , remove bamboo , saw bamboo , pared bamboo , tied scaffold , inspection on scaffold ....

At about 4:30 pm , each section start construct their scaffold ...
we starter with move on the bamboo from the store bamboo site to behing the building ...
Section 2 XMEN saw the bamboo into 1.5m length ...

measured in 1m between the distance of 2 bamboo ...



all superwoman including me ^^ are trying to pull up
the rope and tied tighten the bamboo by using wet rope ....



team work ... work together !!


this is the look of the bamboo that we tied ...

senior come to teaching us about the right tie method ...
he also helping us in the tie process ... TQ senior ^^


finally finish done scaffold ...

product ^


En. WANB checking on our tie method ...
(rules) he wan the rope is very tighten , no slack anymore ...
no spacing between the rope that we tie ...